The expansion of the Timber Ridge subdivision required new public utilities, including water. The multi-discipline...
Fairborn Bikeway Connector
This project constructed a 0.75-mile multi-use path that connects the existing bike path at State...
Farmersville-West Carrollton Road Bridge Rehabilitation over the Great Miami River
Originally construction in 1972, this bridge was structurally deficient. The 600-foot existing bridge had side-mounted...
Fall Protection Evaluation & Abatement
In this large-scale project, LJB performed a roof fall hazard identification audit of 30 buildings...
Fall Protection Design for Wastewater Treatment Plant
At the city’s wastewater treatment plant, workers faced fall hazards of up to 65 feet,...
Downtown Business District Transportation Study
The purpose of the study was to develop a preferred transportation plan that would balance...
Commercial Street Corridor Bike Route Neighborhood Connection
This project improves the Commercial Street Corridor and the Commercial and Garnsey Street intersection by...
Central Avenue/East Dixie Drive Signal System Replacement
LJB replaced and upgraded the traffic signal system and installed ADA compliant pedestrian curb ramps...
Central Avenue & Cedar Street Intersection Improvements
The purpose of this project was to improve the safety at the intersection of East...
Adams Street Bridge Replacement
The Adams Street Bridge, originally built in 1913, had significant deterioration and did not meet...
U.S. Route 68 (Detroit Street) and U.S. Route 42 (West Main Street) Safety and Pedestrian Improvements
The lack of dedicated bicycle infrastructure and way-finding signage for cyclists on Detroit Street created...
State Route 799 Conventional and Composite Bridge Replacements
For this unique pilot project, LJB designed the replacement of two prestressed concrete box beam...