Westside Purple Line Extension, Phase 3: Rail Transit Line

  •  
  • Role: Tunnel Design Lead; Design Build for Contractor
  • Client: STV Inc.
  • Construction Cost: $1.27 Billion
  • Technology: EPBM
  • Geology:  Soft Ground
  • Dimensions: 20.3 ft ID (6.1 m)
  • Length: 2.6 mi (4.2 km)
  • Depth: 50-70 ft (15-21 m)
Project Elements:

  • Twin-bore tunnel in dense urban environment
  • Santa Monica fault – 700 ft wide at 63⁰
  • Undercrossing critical highway and water supply infrastructure
  • Undercrossing Westfield Shopping Mall
  • Multiple segmental lining designs, including regular, fault crossing special, cross passage special
  • Break-in and out of stations
  • Seismic connection between station and tunnel
Client
STV Inc.
Location
Westwood (Los Angeles), CA

Related Projects

RELLIS Data Center

RELLIS Data Center

At Texas A&M University’s RELLIS Campus, LJB delivered full structural design…
University of Maine Farmington

University of Maine Farmington

Our team provided site design, traffic and parking studies, and permitting…
Mount Ararat High School

Mount Ararat High School

Our team partnered with PDT Architects to redevelop Mt. Ararat High…