Walgreens Distribution Center Addition

LJB provided both civil and structural engineering for this project, which adds functional space to the existing Walgreens Distribution Center in three areas, including offices, warehouse and shipping. The shipping and warehouse portions consist of almost 400,000 square feet and are constructed of load-bearing concrete wall panels, steel roof framing, and interior steel columns.

Client
Contegra Construction Company
Location
Perrysburg, OH

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Crenshaw/LAX Transit Corridor

Crenshaw/LAX Transit Corridor

Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…