The 29,000-square-foot addition to St. Anthony High School created a secure entrance, with more classroom space, a 400-seat multipurpose room, and a 2,100-seat gymnasium. Tilt-up concrete construction was selected for this project due to its speed, strength and thermal properties. Wall panels were stack-cast three high, because only a minimum amount of floor space was available. The structure also includes numerous offsets and corners, as well as two elevations of embedded steel for connections of mezzanine and roof structures. To add architectural interest, the building features curved window and door openings. Brick and EIFS were used as exterior finishes.
Client
Hance, Utz and Associates, LLC
Hance, Utz and Associates, LLC
Location
Effingham, IL
Effingham, IL
Related Education Projects
Interurban Pedestrian Bridge
LJB supported Chagrin Valley Engineering, LTD (CVE) in the design and…
Hancock County Bridge Replacements
LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan
This project for the Muskingum Watershed Conservancy District involved master planning…



