Sintavia at Port 95

LJB provided tilt-up wall panel engineering for this 48,000-square-foot building that includes manufacturing space and corporate office for a leading additive manufacturer in the aerospace and defense industry. The advanced facility boasts $25M worth of equipment, including medium and large-format metal 3D printing systems, EDM’s post processing machines, wet-booths, and several furnaces. The facility is comprised of three distinct portions. The outdoor mechanical yard at the northeast corner is enclosed with free-standing tilt-up panels screening the equipment from perimeter views. The northern portion of the facility houses a combination of high-bay and two-story manufacturing space to support the company’s functional needs. The southern portion has additional manufacturing space on the ground floor, but primarily functions as the customer reception on the ground floor coupled with corporate offices on the second floor.

This project received a 2020 Tilt-Up Achievement Award from the Tilt-Up Concrete Association.

Client
Woodland Tilt-Up
Location
Hollywood, FL
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…