S.R. 4 and South Gilmore Road-Holden Blvd. Sustainable Intersection Improvements (Greenroads Certified)

  •  

LJB worked with the City of Fairfield to improve both the flow of traffic and safety hazards at the intersection of State Route 4 and Gilmore and Holden, one of the busiest and most accident-prone locations in the city. The project realigned and widened the Gilmore and Holden approaches, restriped State Route 4 to include a second left-turn lane, and changed the horizontal alignment to the Holden and Gilmore approaches. The project also converted the existing span wire signal to a city standard mast arm, designed to account for additional turn lanes and connected to the city’s central signal system.

While designing the project, LJB applied sustainable transportation practices that led to the project becoming Ohio’s first project certified by the Greenroads® Rating System. Greenroads recognizes projects that have been designed to a level of sustainability that is higher than what is considered common practice.

Client
City of Fairfield
Location
Fairfield, OH

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…