Permanent Party Barracks – Phases I, II and III

As part of a three-phase design-build project to create new housing at Fort Leonard Wood Base in Missouri, LJB provided structural and civil engineering services. LJB performed structural engineering design and drafting for 64 wood-framed two-story apartment-style barracks. A consistent design style was used including wood stud bearing walls with masonry and siding veneer, wood joist floors and wood truss roofs. To aid in the quality of the project and the speed of construction, the wood stud bearing walls and wood joist floors were pre-fabricated off-site and delivered to the project site as panels. Civil and site design services included mass grading to accommodate new streets and storm sewers; new water and sanitary mains; parking; preliminary and final site design, including roadway, grading, and utility upgrades; and overall finish grading. The first two phases earned LEED Silver and phase III achieved LEED Gold certification.

Client
S.M. Wilson & Co.
Location
Ft. Leonard Wood, MO

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…

    * required fields