Olathe Junior High #9

This 98,000-square-foot facility features a two-story academic wing and a lower level athletic wing that consists of two gymnasiums and a natatorium. The original concept for the building was traditional masonry, but an option for design-build tilt-up provided a cost savings that put the project $600,000 under budget and shaved two months off the schedule.

The exterior of the wall panels are a sampling of many different architectural finishes, including multiple types of cast-in brick, curtain wall windows and a hard trowel finish.

The building features insulated and non-insulated tilt-up concrete wall panels. One of the project’s greatest challenges was achieving an acceptable finish for the interior of the tilt-up panels in the athletic wing so additional finishing was not required on the inside.

Client
Summit Concrete
Location
Olathe, KS

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…