Novack Bridge Replacement

  •  

After this bridge had been closed to traffic due to structural deficiencies, LJB was contracted to provide a feasibility study for replacing the bridge with a culvert. During the initial flood study, LJB concluded that a simple span box beam bridge would be more cost efficient than the large multiple box culverts that would be required for a No-Rise Certification due to an upstream home within the FEMA floodplain. Our transportation team then proceeded with design services for the bridge replacement. The design included a new bridge on a realignment to minimize impacts to local property owners and avoid impacts to existing utilities, including an aerial sewer crossing. Additional services included hydraulics, roadway, erosion control, and traffic control.

Client
City of Winston-Salem
Location
Winston-Salem, NC

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…