Metro Storage

This new 53,600-square-foot, three-story storage facility features more than 550 individual units. Features of the location include 100% climate-controlled storage, drive-up access units, large interior drive-in loading/unloading bays with additional access points around the building, elevator access and a large, modern retail office. The project was completed in less than 8 months, bringing much needed new options for this community.

This project also helped showcase the tilt-up construction method through a series of videos, which can be viewed here.

Client
Bedrock Concrete Corporation
Location
Wall Township, NJ

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…