Medina Line Road Design-Build Bridge Replacement

  •  

LJB completed a value engineering study for this bridge replacement project and developed a more cost-efficient solution than the precast arch culvert structure originally proposed. LJB then led the structure design as part of the design-build team that delivered this new 35-foot single-span, composite box beam bridge on integral abutments.

Client
Summit County Engineer’s Office & Mosser Construction Inc.
Location
Akron, Ohio

Related Projects

Mercy Hospital (Northern Light Health)

Mercy Hospital (Northern Light Health)

Since 2001, Gorrill Palmer (and LJB Engineering Company) has been a…
Kings Island Drive Roadway & Safety Improvements

Kings Island Drive Roadway & Safety Improvements

To support increasing traffic demands, as well as the development of…
Fall Protection for Critical Care Building

Fall Protection for Critical Care Building

LJB served as the fall protection consultant for this new 650,000-square-foot…