LJB completed a value engineering study for this bridge replacement project and developed a more cost-efficient solution than the precast arch culvert structure originally proposed. LJB then led the structure design as part of the design-build team that delivered this new 35-foot single-span, composite box beam bridge on integral abutments.
Client
Summit County Engineer’s Office & Mosser Construction Inc.
Summit County Engineer’s Office & Mosser Construction Inc.
Location
Akron, Ohio
Akron, Ohio
Related State + Local Government Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…




