Medina Line Road Design-Build Bridge Replacement

  •  

LJB completed a value engineering study for this bridge replacement project and developed a more cost-efficient solution than the precast arch culvert structure originally proposed. LJB then led the structure design as part of the design-build team that delivered this new 35-foot single-span, composite box beam bridge on integral abutments.

Client
Summit County Engineer’s Office & Mosser Construction Inc.
Location
Akron, Ohio