Linn Energy

Linn Energy wanted to create a new office space that would attract talent to the growing gas corporation. The architect chose tilt-up concrete construction to reduce project costs and shorten the delivery schedule. The resulting dynamic four-story, 110,000-square-foot structure was delivered ahead of schedule and within budget.

To create large glazed openings, a series of spandrel panels were used between full height panels.  Corner spandrels were suspended from full-height framing and structural steel columns to accomplish the fully-glazed corners desired. Tilt-up panels were also used on the stair cores to augment the shear walls on the exterior perimeter.

Client
Wakefield Beasley & Associates
Location
Oklahoma City, OK

Related Projects

Interurban Pedestrian Bridge

Interurban Pedestrian Bridge

LJB supported Chagrin Valley Engineering, LTD (CVE) in the design and…
Hancock County Bridge Replacements

Hancock County Bridge Replacements

LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan

Atwood Lake Peninsula Master Plan

This project for the Muskingum Watershed Conservancy District involved master planning…