LJB provided permitting and design for the replacement of approximately 4,000 lineal feet of 12-inch sanitary sewer serving Area B of Wright-Patterson AFB. The sewer was a main trunk located along a Norfolk Southern rail line. The design included surveying, wetland review, railroad permitting to work in the rail right of way, a 150-foot jack and bore section under a public street, and the upsizing of the existing sewer utilizing pipe bursting methods and replacement of all manhole structures.

Client
American Water Military Services
Location
Wright-Patterson AFB, Ohio

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…

    * required fields