LJB performed evaluations and improvements on six parking lots at Husky Energy Corporation. LJB’s team conducted evaluations of traffic control, pavement markings, and southbound traffic prior to improvement design. Improvements were made to parking lot pavement surface and markings, signage, safety of parking lots, and parking lot layout. The project is ongoing, with one of the six parking lots constructed so far. The other five are under design.
Client
Husky Energy Corporation
Husky Energy Corporation
Location
Lima, OH
Lima, OH
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Crenshaw/LAX Transit Corridor
Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…