Fellowship Alliance Chapel

This 69,000-square-foot religious facility was constructed in nine months using the site cast tilt-up construction method. One of the biggest challenges of the project was the 156-foot clear span from the back of the sanctuary to the altar. To accommodate the desired height of the sanctuary, the team created 61-foot tall panels. The facility also contains a cantilevered balcony and a stepped-down floor in the sanctuary, which was challenging to construct on a tilt-up building. Multiple gable roofs and dormers with roof slopes of 4:12 created panel forming challenges, especially for several angled panels. Due to the wide window openings, many panels had to be stitched together prior to cutting temporary legs cast with the panels.

Client
Bedrock Concrete Corporation
Location
Medford, NJ
Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…