Fellowship Alliance Chapel

This 69,000-square-foot religious facility was constructed in nine months using the site cast tilt-up construction method. One of the biggest challenges of the project was the 156-foot clear span from the back of the sanctuary to the altar. To accommodate the desired height of the sanctuary, the team created 61-foot tall panels. The facility also contains a cantilevered balcony and a stepped-down floor in the sanctuary, which was challenging to construct on a tilt-up building. Multiple gable roofs and dormers with roof slopes of 4:12 created panel forming challenges, especially for several angled panels. Due to the wide window openings, many panels had to be stitched together prior to cutting temporary legs cast with the panels.

Client
Bedrock Concrete Corporation
Location
Medford, NJ
Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse

Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse

This 110,000-square-foot cold storage facility was designed and constructed with precision…
Pipeline Relocation along IH 820

Pipeline Relocation along IH 820

Our team performed engineering and surveying services for the relocation of…
Grapeview Station Facility Expansion

Grapeview Station Facility Expansion

Prior to joining LJB Engineering, Grantham & Associates provided site civil…