Empire West Phase 1

LJB provided structural design for three front-loaded, speculative warehouses in this new business park, measuring a total of 1 million square feet. The buildings were constructed with conventional structural steel and concrete tilt-up wall panels on the perimeter. For this project, LJB performed structural design and steel detailing at the same time, which delivered a compressed schedule, cost savings and increased accuracy. This approach worked so well on 1 million square feet of buildings for Phase I that LJB also provided the same services for Phase II.

Client
Ware Malcomb
Location
Brookshire, TX

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Crenshaw/LAX Transit Corridor

Crenshaw/LAX Transit Corridor

Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…