Dryden Road Resurfacing (MOT-CR701 Dryden-1.96)

  •  

This project included the rehabilitation of approximately 7,200 feet of Dryden Road in Moraine, Ohio. The existing roadway included five lanes of pavement consisting of concrete base with an asphalt overlay and curb with intermittent sidewalks. LJB removed curb cuts and drive aprons to vacant lots to improve the city’s ability to control access.

Client
City of Moraine
Location
Moraine, OH

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…