Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure up to current standards while keeping their data housed on proprietary company-owned servers for better control and retrieval of data. The goal of the project was to provide the organization with a disaster recovery/data center to support worldwide operations. The key component was providing a facility that could survive an EF5 tornadic event and keep all systems functioning. This concept was derived around a site cast tilt up concrete structure that incorporated faux windows and a roof that was designed as a two-layer system to provide further protection in a high-speed wind event, enabling quick response repairs while providing a water-resistant temporary protection layer.

Client
Confidential
Location
Midwest

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…