This facility is the first building in a planned five-building, 200-acre industrial park in York, Pennsylvania—an ideal industrial location for tenants looking to serve the Northeast and Mid-Atlantic region. LJB provided structural design for the 480,000-square-foot warehouse/distribution facility that features dock-high loading doors and drive-in ramps along the 1,500-foot-long rear wall located on the north side of the building.
Client
Ware Malcomb
Ware Malcomb
Location
York, PA
York, PA
Related Industrial / Manufacturing Projects
Atlantic Packaging
LJB provided structural design of this 469,000-square-foot end-loaded build-to-suit manufacturing facility,…
Lehman Farms Building 2
Tilt-up construction was used to build this new industrial facility that…
Trinity-Weber Boulevard Industrial Park Building 1
As the structural engineer of record for this project, LJB prepared…