LJB provided structural engineering for Cold Link Logistics’ warehouse expansion in Sioux City, IA. This 155,000-square-foot addition includes a freezer, swing space, and cold dock area. LJB designed structural steel framing, slab-on-grade floors with insulation, perimeter bracing, and reinforced existing roof joists for added snow drift loads. The team also designed a new egress stair pit and coordinated with all trades to keep the project on schedule. Optional services include rooftop dunnage and elevated walkways for condensers. LJB supported the entire process, from design development through permit and construction phases, helping Tippmann Construction deliver a durable, code-compliant cold storage facility.
Client
Tippmann Construction
Tippmann Construction
Location
Sioux City, IA
Sioux City, IA
Related Commercial Projects
VA Community-Based Outpatient Clinic
Our structural and civil teams collaborated on the design of a…
300 Redstone
This new building serves as a central conference and nationwide collaboration…
Redstone Gateway 8000
LJB’s structural team designed this four-story, tilt-up concrete Class A office…






