Bridge Replacement over West Branch of Mahoning River

  •  

LJB designed the replacement of this existing single-span slab bridge and installation of new abutments. The replacement bridge is a new 60-foot single-span prestressed concrete box beam bridge with a composite concrete deck and reinforced concrete integral abutments on pile foundations placed behind the existing ones. All work was above the ordinary high-water mark for the stream, there were two right-of-way takes, and utility relocations were required. Associated approach roadway work included pavement replacement of approximately 25 feet at each end of the bridge and guardrail upgrades.

Client
ODOT – District 4
Location
Ravenna Township, OH

Related Projects

RELLIS Data Center

RELLIS Data Center

At Texas A&M University’s RELLIS Campus, LJB delivered full structural design…
University of Maine Farmington

University of Maine Farmington

Our team provided site design, traffic and parking studies, and permitting…
Mount Ararat High School

Mount Ararat High School

Our team partnered with PDT Architects to redevelop Mt. Ararat High…