Benchmark Drive

LJB provided the structural design for the construction of this 189,280-square-foot, single-story, build-to-suit distribution center for Ability Tri-Modal Distribution Services that includes a 1,560-square-foot office appendage. The facility was designed for the seismic requirements of Charleston, SC.

Client
Evans General Contractors
Location
Ladson, SC

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…