In 2016, Bass Lake overtopped the emergency spillway during the flooding caused by Hurricane Matthew....
Greensboro-Randolph Megasite
Located in the heart of North Carolina, the 1,500-acre site was selected due to its...
Lumbee Tribe of NC Cultural Center Dam Repair
The lake at Lumbee Tribe of North Carolina’s Cultural Center is an integral part of...
Shipyard Boulevard Bus Pullout and Sidewalk Improvement (NCDOT U-5534N)
The City of Wilmington selected LJB to provide engineering design services for Shipyard Boulevard (U.S....
NCDOT Express Feasibility Studies
This limited services contract allows the NCDOT to supplement their limited resources with well-trained personnel...
Interstate 90 Bridge Replacements
This project involves the complete replacement and widening of two pairs of bridges: Interstate 90...
ODOT Pedestrian Safety Improvement Program
As the Ohio Department of Transportation’s statewide safety design consultant in 2019, LJB developed Ohio’s...
Spring Park Drainage Improvements
Severe bank erosion along the stream at Spring Park in Winston-Salem, North Carolina, was threatening...
State Route 235 over Cemex Haul Road Underpass Bridge
LJB Inc. designed this new bridge underpass to enable Fairborn Cement Company to extend its...
Wright State Way Pedestrian Bridge over Interstate 675
This project constructed a new 500-foot pedestrian bridge over Interstate 675 connecting the cities of...
S.R. 4 and South Gilmore Road-Holden Blvd. Sustainable Intersection Improvements (Greenroads Certified)
LJB worked with the City of Fairfield to improve both the flow of traffic and...
County Road 25A Phase III Reconstruction
This project widened 3,900 feet of County Road 25A with a center turn lane, new...