Tilt-up construction was used to build this new industrial facility that supports important economic development and distribution of goods in the Central Ohio region. The single-story, 1,193,920-square-foot building was constructed with insulated-composite wall panels, and curb appeal was augmented with complex panel returns, overlapping panels and exterior canopies.
The new distribution facility is the largest speculative warehouse in the central Ohio region as of 2022.
This project was designed and began construction in 2021, during a time when material prices and availability were highly volatile. Due to material procurement, extended lead times, and overall size of the facility, LJB’s design delivery was crucial to achieve the scheduled project completion. LJB delivered tilt-up panel design over a period of nine weeks, using an integral four-phase approach to begin the shop drawings and material procurement process.