This bridge replacement project required unique design and collaboration to not only address the deteriorated bridge, but to also accommodate a roundabout located immediately adjacent to the bridge’s rear abutment. The bridge design involved the replacement of a 3-span continuous steel beam structure with a 128-foot single span, composite, prestressed I-beam bridge with flared geometry. To accommodate the adjacent roundabout, the bridge was shifted 20 feet to the east from the existing location, and it was constructed variable width. The bridge was built through a county-let contract, and the roundabout was built simultaneously under a separate Ohio DOT-let contract. Combined, these projects improved congestion and safety by replacing a deteriorated bridge and upgrading the adjacent intersection from a T-type intersection to a roundabout.
Client
Butler County Engineer’s Office
Butler County Engineer’s Office
Location
Liberty Township, OH
Liberty Township, OH
Related State + Local Government Projects
Uptown Streetscape Improvements
LJB is leading the Uptown Implementation Plan, which is a detailed…
Columbus County Bridge Replacement
LJB served as the prime consultant providing engineering services in the…
Novack Bridge Replacement
After this bridge had been closed to traffic due to structural…