Lehman Farms Building 2

  •  

This 1.2 million-square-foot light industrial building was originally designed by an engineer who had limited experience with the tilt-up concrete method. LJB’s expertise with this construction method and deep understanding of its construction allowed us to redesign this facility much more efficiently by value engineering the project. LJB’s updated design used a composite wall system that minimized both the concrete and steel needed for the wall panels. This more efficient design saved the contractor $400,000 in material costs.

Client
Pepper Construction, VanTrust Real Estate & Red Architecture
Location
Lockbourne, Ohio

Related Projects

Atlantic Packaging

Atlantic Packaging

LJB provided structural design of this 469,000-square-foot end-loaded build-to-suit manufacturing facility,…
Lehman Farms Building 2

Lehman Farms Building 2

Tilt-up construction was used to build this new industrial facility that…
Trinity-Weber Boulevard Industrial Park Building 1

Trinity-Weber Boulevard Industrial Park Building 1

As the structural engineer of record for this project, LJB prepared…