State of Ohio Computer Center (SOCC) Security Upgrades

  •    •  

This project provides the Department of Administrative Services (DAS) with upgraded internal and external security measures at the State of Ohio Computer Center (SOCC) to reduce risk of unauthorized entry onto the SOCC premises. These upgrades, with physical modification and security system enhancements, include vehicular traffic routing modifications, perimeter security barrier modification & enhancements and electronic security systems modifications & enhancements.

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…

    * required fields