The failing storm sewer and water main were creating sinkholes and destroying pavement in the City of Kent. LJB conducted a drainage study and designed the replacement of residential water service lines, fire hydrants, crosswalk curb ramps, water mains, storm sewers, residential storm sewer laterals, sidewalks, and concrete driveway aprons. The City obtained additional funding to include pavement resurfacing and curb replacement in the project.
Valleyview Street & Morris Road Waterline & Stormwater Improvements



Client
City of Kent
City of Kent
Location
Kent, Ohio
Kent, Ohio
Related State + Local Government Projects
Interurban Pedestrian Bridge
LJB supported Chagrin Valley Engineering, LTD (CVE) in the design and…
Hancock County Bridge Replacements
LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Alex-Bell Road Bridge over Holes Creek Rehabilitation
This bridge rehabilitation project involved the replacement of the existing non-composite…


