This facility for outdoor outfitter and sporting goods retailer Gander Mountain was constructed on an aggressive schedule of only five months from groundbreaking to completion. The $12 million project was the first building in the WaterWalk development making coordination with simultaneous infrastructure construction critical. The design-build team selected tilt-up construction because it was the only option to meet the schedule demands and provide the desired aesthetic for the owner. The building features non-insulated tilt-up concrete wall panels with large timber framing at the main entrance and a stone veneer accents, giving the store a rustic lodge appearance. Two gabled trussed towers accentuate the front corners of the building. An interior skylight allows natural light into the shopping area. Since Gander Mountain has a significant stock of firearms, security was a primary concern for the owner. To accommodate this, the structure consists of 13-inch thick steel-reinforced concrete wall panels. LJB Inc. provided structural engineering for this project.
Client
Ayars & Ayars, Inc.
Ayars & Ayars, Inc.
Location
Wichita, KS
Wichita, KS
Related Commercial Projects
Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse
This 110,000-square-foot cold storage facility was designed and constructed with precision…
Pipeline Relocation along IH 820
Our team performed engineering and surveying services for the relocation of…
Grapeview Station Facility Expansion
Prior to joining LJB Engineering, Grantham & Associates provided site civil…







