Winston Lake Greenway & Dredging

  •  

For this project to design improvements to Winston Lake, LJB was called upon to develop a method to remove silt and improve water quality. Instead of hauling 18,000 cubic yards of silt to a certified landfill, our team worked to coordinate and manage the removal and transport of the material to be used on a nearby city-owned property. When the lake was dredged, the materials were pumped a short distance to the site of a new golf driving range and then the material was treated with sedimentation bags to remove water. This innovative solution saved the city $200,000 in transportation and removal costs and enhanced another city project at the same time.

Client
City of Winston-Salem
Location
Winston-Salem, North Carolina

Related Projects

Hancock County Bridge Replacements

Hancock County Bridge Replacements

LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan

Atwood Lake Peninsula Master Plan

This project for the Muskingum Watershed Conservancy District involved master planning…
Alex-Bell Road Bridge over Holes Creek Rehabilitation

Alex-Bell Road Bridge over Holes Creek Rehabilitation

This bridge rehabilitation project involved the replacement of the existing non-composite…