Winston Lake Greenway & Dredging

  •  

For this project to design improvements to Winston Lake, LJB was called upon to develop a method to remove silt and improve water quality. Instead of hauling 18,000 cubic yards of silt to a certified landfill, our team worked to coordinate and manage the removal and transport of the material to be used on a nearby city-owned property. When the lake was dredged, the materials were pumped a short distance to the site of a new golf driving range and then the material was treated with sedimentation bags to remove water. This innovative solution saved the city $200,000 in transportation and removal costs and enhanced another city project at the same time.

Client
City of Winston-Salem
Location
Winston-Salem, North Carolina

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…