LJB provided design support services and environmental clearance activities for this 10-foot, all-purpose trail connector located within the Cleveland Metroparks’ Brecksville Reservation. This connector provides pedestrian and bicycle connectivity to the existing Cleveland Metroparks. LJB provided measures that minimize harm and resulting mitigation to the protected recreational activities, features, or attributes associated with the adjacent Brecksville Reservation or Seneca Golf Course. LJB also created cross sections of the bikeway alignment and designed curb ramps at each intersection.
Client
Cleveland Metroparks
Cleveland Metroparks
Location
Brecksville, Ohio
Brecksville, Ohio
Related State + Local Government Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…







