Trinity-Weber Boulevard Industrial Park Building 1

As the structural engineer of record for this project, LJB prepared structural design documents for bidding, permitting and construction.

This project consists of a 42,160-square-foot, single-story, cross-docked, speculative warehouse with a 36-foot clear height. The design includes ground-floor office buildouts in each of the four building corners.

Building elevations include two overhead drive-in doors on each dock elevation in addition to dock-high loading doors in between, as well as a storefront entry and punched window openings at each corner programmed for a future office build-out.

Client
Frampton Construction
Location
Ladson, South Carolina

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…