Trinity-Weber Boulevard Industrial Park Building 1

As the structural engineer of record for this project, LJB prepared structural design documents for bidding, permitting and construction.

This project consists of a 42,160-square-foot, single-story, cross-docked, speculative warehouse with a 36-foot clear height. The design includes ground-floor office buildouts in each of the four building corners.

Building elevations include two overhead drive-in doors on each dock elevation in addition to dock-high loading doors in between, as well as a storefront entry and punched window openings at each corner programmed for a future office build-out.

Client
Frampton Construction
Location
Ladson, South Carolina

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…