Trinity-Weber Boulevard Industrial Park Building 1

As the structural engineer of record for this project, LJB prepared structural design documents for bidding, permitting and construction.

This project consists of a 42,160-square-foot, single-story, cross-docked, speculative warehouse with a 36-foot clear height. The design includes ground-floor office buildouts in each of the four building corners.

Building elevations include two overhead drive-in doors on each dock elevation in addition to dock-high loading doors in between, as well as a storefront entry and punched window openings at each corner programmed for a future office build-out.

Client
Frampton Construction
Location
Ladson, South Carolina

Related Projects

RELLIS Data Center

RELLIS Data Center

At Texas A&M University’s RELLIS Campus, LJB delivered full structural design…
University of Maine Farmington

University of Maine Farmington

Our team provided site design, traffic and parking studies, and permitting…
Mount Ararat High School

Mount Ararat High School

Our team partnered with PDT Architects to redevelop Mt. Ararat High…