Premier Flex Warehouse I and II

When InterChange, a warehousing, logistics and development company, needed a new warehouse time was of the essence. The owner’s schedule called for only five months to complete the shell construction, with an additional three months for interior fit-out. The veteran design-build team leveraged the unmatched speed of tilt-up construction and constructed the new 64,000-square-foot Interchange Premier Flex II on a very tight schedule.

In addition to a tight schedule, the owner wanted the new warehouse to match the aesthetics of the adjacent buildings. With a dimple formliner and two-tone textured paint finish, the facility fits seamlessly into the industrial park.

Client
Nielsen Builders, Inc.
Location
Harrisonburg, VA

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…