Our team performed engineering and surveying services for the relocation of a petroleum pipeline along IH 820 at Anderson Road in Haltom City, Texas. Our scope of services included topographic and right-of-way surveying, identifying and resolving utility conflicts, engineering plans for open cut construction and direction drilling, as-built survey and detailed record drawings.
Pipeline Relocation along IH 820

Location
Fort Worth, TX
Fort Worth, TX
Related Industrial / Manufacturing Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…


