LJB served as the structural engineer of record for this new 716,000-square-foot, Class A speculative distribution facility located along the I-95 corridor north of Baltimore, MD. Situated on a 60-acre parcel, North East Commons was designed with 40-foot clear heights, 8-inch strategically reinforced concrete slab, and 1 per 7,000-square-foot dock door ratio. Two primary storefronts were also provided, one centered on the north wall and one centered on the south wall.
Client
Ware Malcomb/Trammell Crow
Ware Malcomb/Trammell Crow
Location
North East, Maryland
North East, Maryland
Related Industrial / Manufacturing Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…








