McKaig Road Reconstruction, Phases 2-4

  •  

These roadway improvement projects enhanced the safety and condition of McKaig Road, while revitalizing the corridor. The first two phases of the project included the complete reconstruction of the McKaig Road curb and gutter, sidewalk and pavement for approximately 3,200 lineal feet of the roadway. In addition to roadway improvements, the projects also replaced sanitary sewer, and water main where necessary and added an enclosed drainage system to the corridor. LJB’s approach limited private utility conflicts while taking advantage of the road reconstruction to replace aging buried utilities.

Phase IV addressed an additional 3,000 lineal feet of roadway and included pavement resurfacing, curb and gutter and design of a roundabout. This phase also required proactive stakeholder collaboration to increase buy-in for the improvements.

Each phase of the project was designed with an aggressive schedule, leveraging LJB’s relationships with local railroad and utility partners to complete designs on time.

Client
City of Troy
Location
Troy, Ohio

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…