Harrisonburg Combined Schools Gymnasium Addition

As one of the first school projects in Virginia to use tilt-up, the construction of these two gymnasiums helped educate the local market on the tilt-up method. The biggest challenge for the 220,000-square-foot addition was to incorporate the necessary functions and identities of two different schools.

Client
Nielsen Builders, Inc.
Location
Harrisonburg, VA

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Crenshaw/LAX Transit Corridor

Crenshaw/LAX Transit Corridor

Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…