At the city’s wastewater treatment plant, workers faced fall hazards of up to 65 feet, due to exposed openings at several wet and dry wells. LJB worked with a team of City staff members to establish potential solutions for each situation. Those solutions were evaluated with a variety of criteria, including risk, short- and long-term cost, ability to ventilate, and worker productivity. For both the wet and dry wells, the team developed and discussed three conceptual solutions. Using conceptual designs allowed the team to visualize the solutions, anticipate challenges and gather input from multiple perspectives. With buy-in from all city stakeholders, solutions were selected, designed and installed.
Fall Protection Design for Wastewater Treatment Plant


Client
City of North Ridgeville
City of North Ridgeville
Location
North Ridgeville, Ohio
North Ridgeville, Ohio
Related State + Local Government Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…