Dayton Drive Widening

  •  

LJB designed this roadway widening project, which widened and reconstructed 1,860 feet of Dayton Drive in an area of mixed residential and commercial uses, including several properties that were historically industrial. The project included improvements to the intersection with South Maple Avenue, which required upgrades to the traffic signal and adjustment of driveway approaches. LJB also provided a maintenance of traffic plan, as well as right-of-way and drainage services.

Client
City of Fairborn
Location
Fairborn, Ohio

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…