Commercial Street Corridor Bike Route Neighborhood Connection

  •  

This project improves the Commercial Street Corridor and the Commercial and Garnsey Street intersection by constructing a short segment of multi-use trail and making improvements along existing low traffic volume street corridors to define a shared-use roadway as a designated bike route “neighborhood connector” that links the surrounding residential properties to existing bike trail improvements. Street improvements included curb and sidewalk, drainage and pavement base repairs, new surface asphalt, signage, pavement markings, site furnishing, street tree plantings, and a Rectangular Rapid Flash Beacon (RRFB) to increase safety for pedestrians.

Client
City of Piqua
Location
Piqua, OH

Related Projects

Hancock County Bridge Replacements

Hancock County Bridge Replacements

LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan

Atwood Lake Peninsula Master Plan

This project for the Muskingum Watershed Conservancy District involved master planning…
Alex-Bell Road Bridge over Holes Creek Rehabilitation

Alex-Bell Road Bridge over Holes Creek Rehabilitation

This bridge rehabilitation project involved the replacement of the existing non-composite…