For this project to design improvements to Winston Lake, LJB was called upon to develop a method to remove silt and improve water quality. Instead of hauling 18,000 cubic yards of silt to a certified landfill, our team worked to coordinate and manage the removal and transport of the material to be used on a nearby city-owned property. When the lake was dredged, the materials were pumped a short distance to the site of a new golf driving range and then the material was treated with sedimentation bags to remove water. This innovative solution saved the city $200,000 in transportation and removal costs and enhanced another city project at the same time.
Client
City of Winston-Salem
City of Winston-Salem
Location
Winston-Salem, North Carolina
Winston-Salem, North Carolina
Related State + Local Government Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Crenshaw/LAX Transit Corridor
Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors…





