Replace Cooling Tower – Buildings 10262/10266

When an existing 2,000-ton cooling tower reached the end of its useful life, LJB provided civil and structural design for a new stainless steel cooling tower replacement to meet the demands of year-round operation. The project included removal and disposal of the existing cooling tower, isolation valves, pumps and auxiliary equipment. The new cooling tower has a support building to house chemical tanks and a perimeter screen wall. The design complied with Anti-Terrorism/Force Protection requirements.

 

Client
Wright-Patterson Air Force Base – 88th Air Base Wing
Location
Wright-Patterson AFB, Ohio

Related Projects

Interurban Pedestrian Bridge

Interurban Pedestrian Bridge

LJB supported Chagrin Valley Engineering, LTD (CVE) in the design and…
Hancock County Bridge Replacements

Hancock County Bridge Replacements

LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan

Atwood Lake Peninsula Master Plan

This project for the Muskingum Watershed Conservancy District involved master planning…

    * required fields