Replace Cooling Tower – Buildings 10262/10266

When an existing 2,000-ton cooling tower reached the end of its useful life, LJB provided civil and structural design for a new stainless steel cooling tower replacement to meet the demands of year-round operation. The project included removal and disposal of the existing cooling tower, isolation valves, pumps and auxiliary equipment. The new cooling tower has a support building to house chemical tanks and a perimeter screen wall. The design complied with Anti-Terrorism/Force Protection requirements.

 

Client
Wright-Patterson Air Force Base – 88th Air Base Wing
Location
Wright-Patterson AFB, Ohio

Related Projects

Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse

Okanagan Specialty Fruits Company Controlled Atmosphere Warehouse

This 110,000-square-foot cold storage facility was designed and constructed with precision…
Pipeline Relocation along IH 820

Pipeline Relocation along IH 820

Our team performed engineering and surveying services for the relocation of…
Grapeview Station Facility Expansion

Grapeview Station Facility Expansion

Prior to joining LJB Engineering, Grantham & Associates provided site civil…

    * required fields