Dryden Road Resurfacing (MOT-CR701 Dryden-1.96)

  •  

This project included the rehabilitation of approximately 7,200 feet of Dryden Road in Moraine, Ohio. The existing roadway included five lanes of pavement consisting of concrete base with an asphalt overlay and curb with intermittent sidewalks. LJB removed curb cuts and drive aprons to vacant lots to improve the city’s ability to control access.

Client
City of Moraine
Location
Moraine, OH

Related Projects

Daechang Seat Corp USA

Daechang Seat Corp USA

For Daechang Seat Corp’s new 148,900-square-foot manufacturing facility in Savannah, LJB…
Disaster Recovery Data Center

Disaster Recovery Data Center

LJB assisted a longtime client in bringing its critical electronic infrastructure…
Cold-Link Logistics - Hattiesburg

Cold-Link Logistics - Hattiesburg

LJB provided structural design for Cold-Link Logistics’ new cold storage facility…